Guangzhou Anto Machinery Parts Co.,Ltd.

Professional supplier of spare parts for your construction machiney maintenance!

Manufacturer from China
Verified Supplier
9 Years
Home / Products / Excavator Final Drive /

Original Quality Standard Final Drive 227-6189 For 330D Excavator With Long Life Time

Contact Now
Guangzhou Anto Machinery Parts Co.,Ltd.
Visit Website
City:guangzhou
Province/State:guangdong
Country/Region:china
Contact Person:MrPaul
Contact Now

Original Quality Standard Final Drive 227-6189 For 330D Excavator With Long Life Time

Ask Latest Price
Video Channel
Brand Name :OEM
Model Number :227-6189
Place of Origin :China
MOQ :1 PCS
Price :Negotiable
Payment Terms :Western Union, MoneyGram, MoneyGram, T/T, D/P, D/A, L/C
Supply Ability :100-2000
Delivery Time :3-7 working days
Packaging Details :Wooden box for heavy parts, paper carton for light parts
Category :Excavator Final Drive
Excavator type :Crawler excavator
Parts type :Excavator spare parts, construction machinery parts
Packing :Wood box, standard carton, pallet
Warranty :6 Months
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

  • Original Quality Standard Final Drive 227-6189 For 330D Excavator With Long Life Time

  • Product Specifications

Parts Name Excavator Final Drive 330D
Application
Category Final Drive
Item Condition Unused, undamaged, brand new
MOQ 1

  • Description

The Final Drive reducer gearbox is the last component in the Power Train with undercarriage drive system, producing the final speed reduction and torque increase.


Attributes: Heavy Duty Final Drives are designed to be rebuilt and reused.The belowing following gear components are included in the final drive: sun gear, planetary gear, carrier, ring gear, hub, motor housing, needle bearing, roller bearing, seal.

  • How is order processed

1. Customers offer the part number, part name, model, quantity, data of items, delivery address and term

2. We quote the best price according to the requirement of customers.

3. Confirm the purchase order and pay the deposit.

4.We prepare and pack the goods.

5.Customers make the payment according to the Proforma Invoice once the goods get ready for delivery.

6. We deliver the goods with the packing list, commercial invoice, B/L and other documents requested.

7.Track the transport and arrival about the goods.

8.Welcome to give us suggestion and feedback once arrival.

  • Packaging and Delivery

Packaging details: Standard export carton, Wooden box, Polly-wood Pallet, Packaging film

Delivery: 2-5 days for parts in stock, 5-20 days for parts not in stock.

  • Payment and Delivery

Payment term: T/T, Western Union, Escrow, Money Gram, Papal

Delivery date: 2-5 days for parts in stock, 5-20 days for parts not in stock

  • Note

A. In order to give you fast and accurate pricing information, we need some details about your engine/Application and the part number of the part you want.

B. If you cannot find the parts you need, please contact us with details.

  • Other gearbox we are manufacturing

Original Quality Standard Final Drive 227-6189 For  330D Excavator With Long Life Time

Inquiry Cart 0